  • Completed Projects 2011:

Lomati Dam, Barberton – Sampling and Drilling for the rehabilitation of spillway and raising of dam wall
 
Areva Resources, Namibia – Sampling Leach Heaps
 
Bridge Sites on Nwandi & Klein Letaba rivers – Geotechnical investigation for bridge foundations

  • Completed Projects 2010:

Steelpoort (Booysendal Mine) –  Drilling for portal stability
Carnarvon, Western Cape – Quarry investigation

  • Walvis Bay Project. Namibia 2010

    Drilling to 20m for Fuel storage containers

  • Rossing Mine Leach Heap Sampling . Namibia 2010

    Window Sampling to 5m  testing  for Uranium content.

  • Kuvaninga Geotech Project Chokwe, Mozambique 2010

    T2 Rotary Core Drilling to 10m for new Gas Power Station.

  • Council of Geoscience SA
    a
    Carried out feasibility study in Roodepoort wetland area by means of DPSH testing & Window Sampling.
    a
  • CMC (Cooperativa Muratori Cementisti Ravenna)
    a
    DPSH testing for retaining wall on the N12 Germiston Highway.  This project was carried out at night due to traffic regulations.
    a
  • Tenke Fungurume Mining Project in the Democractic Republic of Congo:
    a
    4 quarry sites NWD4 /TNW drilled to depths between 30m – 50m in  difficult dolomite  formation with cavities,  as well as 4 storm water dam sites (NWD4 drilling and SPT’s every 1.5m to depth of 30m)
    a
  • R21 Interchange in Pretoria, South Africa:
    a

    19 holes drilled for piling purposes. (NWD4 drilling from surface, formation red shale)
    a
  • Burnstone Mining Project, Balfour:
    a

    Geotech ground investigation carried out for slime dams with lugeon tests. (equipment used window sampling, SPT’s and NWD4 drilling, formation soft clays to mudstones)
    a
  • Inyanda Dam, Witbank:
    a

    DPSH, window sampling and NWD4 drilling to 15 m with SPT’s for new dam wall. Formation soft sands to clay to dolerite.
    a
  • Bella Vista Rice Mill, Mozambique:
    a

    Investigation for formation stability for new Rice Mill. DPSH, continuous  window sampling and SPT’s, formation running sands to stiff sandstone.
    a
  • Matola Concrete Factory, Mozambique:
    a
    Ground investigation for cement mill extension foundations (DPSH/ continuous window sampling and NWD4 drilling to 15m) formation calcrete clay to very jointed hard calcrete to sandstone.
News
August 2010
New projects completed

Walvis Bay Project (Namibia), Rossing Mine Leach Heap Sampling (Namibia), Kuvaninga Geotech Project Chokwe (Mozambique)